| 231 |
Construction of 132kV Tran line from 132kV Ambassa – Gandach |
|
| 232 |
Final Reports of Action Plans for the Development of NER on Horticulture |
Download (5.4 MB)
|
| 233 |
Final Reports of Action Plans for the Development of NER on Oil Palm |
Download (5.27 MB)
|
| 234 |
Final Reports of Action Plans for the Development of NER on Handloom & Handicrafts |
Download (1.24 MB)
|
| 235 |
Final Reports of Action Plans for the Development of NER on Bamboo |
Download (3.15 MB)
|
| 236 |
Construction of Indoor Stadium at Madan Tukhon, Jongsha Meghalaya |
Download (1008.94 KB)
|
| 237 |
Development Programme of Backward Block Under 30 PC Central Sector Scheme of NEC in Raishyabari R.D Block, Gandachara, Dhalai District, Tripura |
Download (3.47 MB)
|
| 238 |
Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Bunghmun W Block of Lunglei District, Mizoram |
Download (6.58 MB)
|
| 239 |
Construction of New Building for Girls in Nongtalang College, Nongtalang, West Jaintia Hills, Meghalaya |
Download (13.77 MB)
|
| 240 |
Establishment of Multi-Utility Cum CFC Building with Diesel Operated Spices & Cereal Grinding Machine |
Download (831.42 KB)
|